zBlog

Archives

Subscribe RSS

Monthly onsite walkthrough

August 12th, 2010 - Posted By: Brad Liljequist

1,800 gallon cisterns, lined up and ready for backfill

Our next monthly walkthrough will be September 2 from 3:30 – 4:30 onsite (they are always scheduled for the first Thursday of the month from 3:30 – 4:30). At this walkthrough we will turn our attention to the rainwater cisterns – we will have the plumbing complete on the pump into the units and so will be discussing that. We will also have floor slabs down, which have slab insulation and hydronic piping issues to work through, and so that will be a topic as well. Come on out and join the fun! Here’s directions to the site - look for us on the sidewalk, east of the Highlands Drive/High Street intersection.

Filed under: Events & Classes     
Tagged:  

Copyright© 2008 zHome | City of Issaquah. All rights reserved. Website design by DC.
Btn Nav  Over Whos Behind It Btn Nav Over About Zhome Btn Nav Over Benchmarks Btn Nav Over Dig Deeper Btn Nav Over Green Your Home Btn Nav Over Home Btn Nav Over Why Green Homes Btn Top Nav Over Events Btn Top Nav Over Newsletter Btn Top Nav Over Zblog